Kasance Yankin Hill -110kV 2020.09 - SiChuan XiangYue Power Line Components Co., Ltd.
  • bg1

Yankin tudu -110kV 2020.09

Sabon ginin layin 110kV daga Quxian Xicheng zuwa Langya, Waya: JL/G1A-300/40-24/7 karfe core aluminum stranded waya, ƙasa waya: JLB20A-80, OPGW-24B1-80.Jimlar tsawon layin shine 29KM, hasumiya na kusurwar ƙarfe shine tushe 90, nauyin Toatl shine ton 550.An sanya hannu kan odar a cikin Satumba 2020 har zuwa bayarwa a cikin Oktoba 2020, kuma sake zagayowar ya kasance kwanaki 35.An sanya shi aiki kamar yadda aka saba a farkon Disamba 2020.

Hill area (6)
Hill area (1)
Hill area (3)
Hill area (4)
Hill area (5)

Aiko mana da sakon ku:

Ku rubuta sakonku anan ku aiko mana