Sunan aikin: Yazhong Jiangxi ± 800 kV aikin watsa HVDC
Muna da haɗin gwiwa tare da Sichuan Electric Transmission and Transformation Construction Co., Ltd. a cikin wannan aikin, tare da jimlar nauyin tan 70, an sanya hannu kan odar a cikin Fabrairu 2021, kuma lokacin samarwa shine kwanaki 22.An sanya shi Aiki bisa ka'ida a farkon Afrilu 2021.
Adireshin: Yazhong, Sichuan Ranar: 02-19-2021
Wasu Ayyukan Kwanan nan
Yazhong Jiangxi ± 800 kV HVDC watsa aikin 2021.02
Sunan aikin: Yazhong Jiangxi ± 800 kV aikin watsa HVDC
Muna da haɗin gwiwa tare da Sichuan Electric Transmission and Transformation Construction Co., Ltd. a cikin wannan aikin, tare da jimlar nauyin tan 70, an sanya hannu kan odar a cikin Fabrairu 2021, kuma lokacin samarwa shine kwanaki 22.An sanya shi Aiki bisa ka'ida a farkon Afrilu 2021.
Adireshin: Yazhong, Sichuan Ranar: 02-19-2021
MianYang - 10KV Na'urorin ƙarfe na ƙarfe 2021.01
Sunan aikin: 10KV Ƙarfe Na'urorin Haɓaka Ƙarfe na Kamfanin Samar da Wutar Lantarki na Jiha Mianyang
Aikin Haɗin kai tare da Kamfanin Samar da Wutar Lantarki na Mianyang na Jiha, yana ba su da na'urorin ƙarfe na ƙarfe na wutar lantarki, jimlar nauyi: ton 540. An sanya hannu kan odar a cikin Janairu 2021, kuma Lokacin samarwa shine Kwanaki 22.An sanya shi Aiki bisa ka'ida a farkon Afrilu 2021.
Adireshi: Mianyang SichuanRanar: 01-10-2021
YunNan-110kV 2020.10
Sunan aikin: 110kV watsa wutar lantarki da aikin canji na tashar wutar lantarki ta aikin gona ta Shabao a gundumar Nayong
Adireshin: BiJie City, YunNanRanar: 25-10-2020
Yankin tudu -110kV 2020.09
Sabon ginin layin 110kV daga Quxian Xicheng zuwa Langya, Waya: JL/G1A-300/40-24/7 karfe core aluminum stranded waya, ƙasa waya: JLB20A-80, OPGW-24B1-80.Jimlar tsawon layin shine 29KM, hasumiya na kusurwar ƙarfe shine tushe 90, nauyin Toatl shine ton 550.An sanya hannu kan odar a cikin Satumba 2020 har zuwa bayarwa a cikin Oktoba 2020, kuma sake zagayowar ya kasance kwanaki 35.An sanya shi aiki kamar yadda aka saba a farkon Disamba 2020.
Adireshi: daga Quxian Xicheng zuwa Langya Kwanan wata: 09-03-2020
Yankin tudu - 220kV 2020.6
Huarun Yuexi Sigan Baozu 84MW Wind Power Project 220kV aikin layin guda ɗaya, Waya: JL/G1A-300/40-24/7, Wayar ƙasa: OPGW-24B1-80.Jimlar tsawon layin shine 19.35KM, Total adadin kusurwar hasumiya ta ƙarfe shine saiti 45, jimlar nauyi shine ton 680.An sanya hannu kan odar a watan Mayu 2020 don bayarwa a watan Yuni 2020, kuma lokacin samarwa shine kwanaki 25.Za a fara aiki da shi a farkon watan Nuwamba 2020.
Yankin tudu -35kV 2020.5
Don sabon aikin daga tashar Wumu mai karfin 110kV zuwa Longyanjing 35kV a Suining, Sichuan, wayar ta ɗauki JL/G1A-300/25 kuma wayar ƙasa ta ɗauki OPGW-24B1-50.Jimlar tsawon layin shine 9.5KM, hasumiyar karfe na kusurwa da sandar bututun karfe sune sansanonin 30, jimlar nauyi shine ton 260.An sanya hannu kan odar a cikin Afrilu 2020 don bayarwa a cikin Mayu 2020, kuma sake zagayowar ya kasance kwanaki 25.An sanya shi aiki bisa ga ka'ida a watan Agusta 2020.
Adireshi: daga tashar Wumu zuwa Longyanjing Suining, Sichuan Kwanan wata: 08-17-2020
Yanki mai tsayi 110kV 2020.1
Sabuwar-gina guda-circuit line aikin a Wangda ~ Bitu 110kV, Zuogong birnin, Tibet, shugaba JL/G1A-185/35-26/7 kasa line GJ-70, da jimlar tsawon layin ne 126KM.Total yawa kwana karfe karfe hasumiya shine saiti 311, jimlar nauyi shine ton 3150.Ya ɗauki kwanaki 90 bayan sanya hannu kan odar a watan Oktoba na 2019 don kammala isar da hasumiya a cikin Janairu 2020, kuma an fara aiki da layin gabaɗaya a watan Agusta 2020.
Adireshin: Zuogong Tibet Ranar: 08-03-2020
Babban yanki -220kV 2019.12
Babban yanki: Mongoliya, sabon ginin madaukai biyu na 110k a gefen mai amfaniMongoliya aikin.Waya: JL/G1A-240/30. Waya ta ƙasa: OPGW-24B1-80.A total tsawon na layin ne 11KM, Total yawa: kusurwa karfe hasumiya ne 35 sets.Jimlar nauyi: 483 ton.An sanya hannu kan odar a cikin Satumba 2019, kuma lokacin samarwa shine kwanaki 22.An sanya shi aiki kamar yadda aka saba a farkon Maris 2020.
Adireshin: Mongolian Ranar: 03-14-2020